HomeTechnicalInstallation

Dry-Wall Construction

Dry-wall construction” is the method that fixes prefinished panels at the site. It shortens curing period for dry-wall construction differing from “Wet-wall construction” such as stucco or paint which needs water.
Besides, the size of panel is big, and simple to construct and shorten the term of construction work.

Merit of Dry-wall Construction

https://dragonkong.com.hk/wp-content/uploads/nichiha_installation01.jpg
https://dragonkong.com.hk/wp-content/uploads/nichiha_installation_icon01.png

EASY INSTALLATION

Timesaving Clip Installation System that reduces construction time and minimizes mistakes.

https://dragonkong.com.hk/wp-content/uploads/nichiha_installation_icon02.png

NO MORTAR, NO MESS

Prefi nished panels that eliminate the need for messy mortar or costly masonry-skilled labor.

https://dragonkong.com.hk/wp-content/uploads/nichiha_installation_icon03.png

ANY WEATHER PRODUCT

Products that can be installed all year round.

https://dragonkong.com.hk/wp-content/uploads/nichiha_installation_icon04.png

LOW MAINTENANCE

No-fuss products. No ongoing cleaning and regular maintenance needed. Your customers get to create it then enjoy it for a long, long time.

Operation of Ventilation

This operation makes an air layer between the panel and building paper (moisture-permeable water-proof sheet).
Using this operation it can be expected to inhibit the entry of rainwater, prevent dew condensation in a wall by letting moisture be out, and block hot air in summer.
It is effective for improvement of building derability.

Inhibition the entry of rainwater and dew condensation
https://dragonkong.com.hk/wp-content/uploads/ventilation01.png
Inhibition the entry of rainwater and dew condensation
https://dragonkong.com.hk/wp-content/uploads/ventilation02.png
Block hot air in summer

Quick installation Flow

1. Installation of furring strips and building paper
https://dragonkong.com.hk/wp-content/uploads/Image_149.jpg
2. Installation of corner trim
https://dragonkong.com.hk/wp-content/uploads/Image_150.jpg
3. Cutting of panel
https://dragonkong.com.hk/wp-content/uploads/Image_151.jpg
4. Fastening panels
https://dragonkong.com.hk/wp-content/uploads/Image_152.png
5. Install panels from the bottom of the wall to the top
https://dragonkong.com.hk/wp-content/uploads/Image_153.jpg
6. Sealant work
https://dragonkong.com.hk/wp-content/uploads/Image_156.jpg

Hardware

Installation hardware requirements for NICHIHA standard installation method
https://dragonkong.com.hk/wp-content/uploads/nichiha_tools.jpg

DRAGON KONG Co., Limited, © All Rights Reserved